Image for the article Medical Device Silicone Prototypes: How to Validate Before Tooling
IndustryNovember 3, 2026Updated November 11, 2026

Medical Device Silicone Prototypes: How to Test Designs Before Tooling

Share

A mold for silicone parts is a significant, hard-to-reverse cost and takes 8–16 weeks to build. For a medical device team, that commitment usually happens before anyone has held a real silicone part in their hand. Every design review up to that point runs on TPU or TPE prototypes, foam mockups, or CAD alone — none of which behave like the material the final product will actually be made of.

That gap is where risk hides. Durometer, compression set, tear strength, and surface feel don't translate from a flexible resin or thermoplastic elastomer to true silicone. A seal that passes review in TPE can still fail in silicone once it's molded, because the two materials respond differently to the same geometry. Tooling only makes that failure expensive to fix.

What "test before tooling" actually means

Design testing isn't a final check before mass production — it's the work of confirming, early and repeatedly, that a design behaves as intended. For medical devices, that means testing the design on real silicone parts against real requirements: fit, seal integrity, flex fatigue and manufacturability, before a single mold is cut.

On-demand silicone additive manufacturing makes this possible without the cost structure of tooling. Parts are made from true silicone, Shore A20 to A60, natural white. TrueSil is the closest printed match to molded LSR, so the design is tested in silicone rather than a substitute like TPU or TPE. Regulatory and biocompatibility testing is then done on the final production part.

What to check before committing to a mold

  • Fit and function. Does the part seal, flex, or actuate the way the assembly requires, in true silicone rather than an approximation?
  • Geometry that molding can't easily reproduce. Undercuts, internal channels, and variable wall thickness are worth testing in additive manufacturing before they're locked into a tool design.
  • Material and process signals. Confirm the material family, Shore hardness, and relevant standards — ISO 10993 and USP Class VI are useful markers of material and process readiness, not a substitute for the certification your specific device requires.
  • Design iteration cost. Each geometry change during design testing should cost days, not a new tool. That's what determines how many iterations a team can actually afford to run.

Why this changes the tooling decision

Teams that test in true silicone before committing to a mold walk into tooling with a design that has already been tested in the closest printed match to molded LSR. Tooling still comes — for volume, for unit economics, for long-term production — but it comes after the design risk has been reduced, not before.

This is the model behind Spectroplast's On-Demand Manufacturing: production-grade true silicone parts, ready to ship within 5 days, no tooling, no minimum order. It's a way to run test cycles in the material that matters, and to decide when — and whether — a mold is the right next step.

Ready to test a design in true silicone before tooling? Request a design testing discussion.

Medical Device Silicone Prototypes